All Products / Contemporary Dresses / RF-06
DEVELOPED STYLE · B2B MANUFACTURING REFERENCE

Brown Floral Satin Lace-Trim Slip Maxi Dress

This developed bias-look maxi dress pairs a fluid floral satin body with delicate lace edging and fine straps. The reference shows our approach to controlling drape, narrow bindings and a close yet fluid silhouette for contemporary occasion collections.

Made-development reference: This page documents a style developed by our team. It is not presented as ready stock. Fabric, color, fit, construction and delivery are confirmed for each brand project.
ReferenceRF-06
ServiceOEM / ODM development
MOQ100 pcs per style / color
Typical first responseWithin 1 business day

Development Highlights

  • Fluid floral satin body
  • Lace-trim V neckline
  • Slim straps and softly flared maxi hem

Customizable for Your Brand

  • Print, color and satin quality
  • Lace width and placement
  • Back depth, lining and dress length

Development & Production

  • Sample development: 7–10 working days after requirements and material direction are confirmed.
  • Bulk production: typically 25–35 days after final approval and deposit.

Final timing depends on style complexity, material availability and order requirements.

Below-MOQ projects are not normally accepted. Established brands with credible production potential may be reviewed selectively; acceptance is not guaranteed.

Fabric & Material Sourcing

Our local sourcing team can source fabrics and trims against the buyer’s requirements.

Printing, embroidery, beading, washing, labels and custom packaging are supported as project services. Applicable third-party costs are charged to the buyer and confirmed in the quotation.

Pattern development, development from a physical sample, and development from a tech pack or reference package are supported.

Before We Quote

  • Target quantity per style and color
  • Fabric and workmanship requirements
  • Size range and measurement standard
  • Target delivery date and destination
INQUIRE ABOUT RF-06

Share the four quotation inputs above plus your tech pack, physical sample or reference package for a useful feasibility review.